Industrial electrical installations
Three phase installations, distribution and machinery connections for factories, processing sites and warehouses.
Three phase, distribution and machinery.
- Three phase distribution
- Machinery connections
- Motor control
- Site wide upgrades
- Shutdown planning
How we work
- 1Free consultationWe look at what you have and what you need, with no obligation.
- 2Tailored designA written quote with the kit list and the numbers before you commit.
- 3Professional installOur own engineers, certified and notified properly.
- 4AftercareServicing and support once the job is signed off.
Three phase distribution and machinery connections
Industrial sites run on three phase for straightforward reasons. The same power arrives down smaller conductors, motors start and run better on it, and the load spreads across the supply instead of leaning on one leg. Most of what an industrial electrician actually gets called to on a factory floor is not exotic. It is an unbalanced supply, a board extended well past what it was designed for, or a machine connected by whoever delivered it and not by an electrician.
Connecting plant properly means starting at the incomer and working outwards. Cable sized for the real duty and the run length, discrimination arranged so a fault on one machine does not drop the whole line, local isolation you can lock off, and a schedule that tells the next person what feeds what. Where the environment is wet, dusty or washed down at the end of a shift, ingress protection and the right glands belong in the specification, because stainless costs less than a rewire in two years.
Motor control and the cost of nuisance tripping
Motors are where industrial installations get interesting. Direct on line starting is simple and hard on both the mechanics and the supply. Star delta or a soft starter takes the edge off the inrush current. A variable speed drive does more again, giving controllable speed and a real energy reduction on fans and pumps that spend their lives throttled. Drives also bring harmonics and screened cabling requirements, so they get specified deliberately and not simply fitted where the old starter was.
Protection has to suit the machine and not whatever device happened to be in the board. Correct overload settings, phase failure and single phasing detection, and properly sized contactors are what stop a stalled motor becoming a burnt out winding and a week of lost output. Where a line is critical it is worth agreeing which spares live on site, because the delay after a failure is almost never the labour, it is waiting for a part.
Shutdown planning on a working site
Nothing on an industrial job costs what the downtime costs. Two hours of isolation on a packing line can be worth more than the entire quote, so the shutdown gets planned as carefully as the installation itself. That means a written sequence, agreed permits and points of isolation, the right locks and warning notices, and proving dead every single time instead of trusting a label somebody wrote in biro years ago.
Most of the work can be prepared while the site keeps running. Containment, cable pulls, new boards and terminations can all be taken to the point where the changeover itself is short, so the actual break in production is measured in hours and not days. Where a site has a genuine shutdown week, that is the moment for the big items. Tell us when yours falls and we will work backwards from it.
We have done this before.
Case studyCommercial Electrical & Lighting UpgradeCoastal Electrical Services & Renewable Energy were appointed by Belvin Construction to carry out a comprehensive electrical upgrade within a designated area of Grantham…
Case studyLinkage Training CentreWe were appointed to deliver a complete electrical and life-safety installation for a specialist training centre operated by Linkage. The project involved transforming…
Case study45 kW Commercial Solar InstallationCES Renewables has successfully completed another premium solar installation, a 45 kW Commercial Solar PV System engineered for efficiency, reliability and long-term…Everything else we do.
Industrial across Lincolnshire.
Based in Skegness and covering the county. If you are not sure whether we reach you, just ask.