Domestic projects
Work in people's homes, where the certification is not paperwork for its own sake. It is what your insurer, your solicitor and the next buyer will ask to see.
What is notifiable, and what that means
Part P of the Building Regulations covers electrical safety in dwellings, and certain work in a home has to be notified to building control. That includes installing a new circuit from the consumer unit, replacing a consumer unit, and altering an existing circuit in a special location, meaning close to a bath or shower or in a room with a swimming pool or sauna, where the risk from water is higher.
There are two ways to satisfy it. Either building control is notified and inspects, or the work is carried out by an electrician registered with a competent person scheme who can self certify it. We are NICEIC approved, which is the second route, and it means the certificate is issued on completion rather than waiting on an inspection.
The certificate is the point
An Electrical Installation Certificate is not a formality. It is the document that gets asked for when a property is sold, when an insurer investigates a claim and when a letting agent needs to demonstrate compliance. Work done without one is difficult to evidence years later, whatever its actual quality.
The underlying standard is BS 7671, the IET Wiring Regulations. The current edition is BS 7671:2018+A4:2026, the 18th Edition as amended in April 2026, and every job we certify is worked and tested to it. The test results form part of what you are handed at the end.
Older housing stock in Lincolnshire
A lot of property in this county is older than its wiring suggests, because circuits have been added over decades rather than planned. Extra sockets, a spur for a shower, a garden supply, each reasonable on its own and collectively a board nobody can read with no spare ways left in it.
The sensible first step is usually an inspection rather than a quotation. An EICR establishes what is genuinely there and what condition it is in, and it very often changes what the right job actually is. It is also the point at which sorting the distribution out first tends to make everything that follows simpler and cheaper.
Recent domestic work
Case study13 Eco Bungalows at Burton Waters, LincolnThe full electrical package for 13 eco bungalows at Burton Waters in Lincoln, with 3.6kW in-roof solar, heat pump connections and LED lighting throughout.
Case studyNew Build Home Electrics and Solar, N R Burton BuildersFirst and second fix wiring for a new build home with N R Burton Builders, plus CCTV, an intruder alarm, an EV charger, solar PV and battery storage.
Case study6.8kW Flat Roof Solar and 9kWh Battery for a HomeA 6.8kW flat roof solar system for a home, using 15 AIKO panels, a 6kW SolaX hybrid inverter, 9kWh of battery storage and shading optimisation.
Case studySix In-Roof Solar Systems on a New Build DevelopmentSix GSE in-roof solar PV systems fitted across a new build housing site, all-black panels to MCS and NICEIC standards, live before the owners moved in.