Skip to content
Coastal Electrical Services (CES) Lincs Ltd
Case study

30kW Ground-Mounted Solar and Battery, Friskney Poultry Farm

Published 17 February 2026

Project Details

  • Client: M Holmes Ltd (Poultry Farm)
  • Location: Friskney
  • Contractor: Coastal Electrical Services & Renewable Energy

Project Overview

Coastal Electrical Services & Renewable Energy were appointed to design and install a ground-mounted solar PV and battery storage system for a small poultry farm operated by M Holmes Ltd in Friskney.

The aim of the project was to significantly reduce the farm’s reliance on grid electricity, offset rising energy costs associated with poultry housing, and introduce on-site energy storage to maximise self-consumption.

System Design & Installation

This installation was designed to provide reliable renewable generation suited to agricultural energy demands, particularly for ventilation, lighting, feeding systems, and environmental controls.

Solar PV Array

  • Installation of 72 × 420W solar panels
  • Total system capacity of 30.24kW
  • Ground-mounted system installed using a ground anchor bolt framework, removing the need for large concrete bases and reducing ground disturbance
  • Optimised panel layout for maximum solar gain and ease of maintenance

Groundworks & Cabling

  • Excavation and installation of cable trenches from the array location to the main electrical distribution point
  • Installation of suitably rated SWA cabling and protection systems for long-term durability in an agricultural environment

Electrical Infrastructure Upgrade

  • Installation of a new 3-phase distribution board to accommodate the solar and battery system
  • Integration with the farm’s existing 3-phase supply and load profile

Inverters & Energy Management

  • Installation of 3-phase hybrid inverters, allowing seamless management of solar generation, battery storage, and site demand
  • System configured to prioritise on-site usage before export

Battery Storage

  • 30kW battery storage system installed to store excess daytime generation
  • Enables evening and early-morning farm loads to be supported by stored solar energy
  • Provides improved energy resilience and reduced peak import from the grid

Testing, Commissioning & Compliance

The project included full:

  • Inspection and testing of all AC and DC circuits
  • Verification of earthing and protection systems
  • Inverter configuration and system commissioning
  • Performance checks to ensure correct generation and battery operation

All works were carried out in accordance with current electrical regulations and best practice for commercial and agricultural environments.

Outcome

The completed system delivers:

  • Over 30kW of on-site renewable generation
  • Reduced operational energy costs for the farm
  • Lower carbon footprint
  • Improved energy independence through battery storage
  • Robust infrastructure designed for demanding agricultural conditions

This project demonstrates our expertise in ground-mount solar, three-phase systems, and agricultural electrical installations, providing reliable, future-proof renewable solutions for rural businesses.

From site

Photographs from the job.

Two SolaX three phase inverters with isolators above six Triple Power battery modules on the farm's blockwork wall
A digger beside a freshly dug cable trench running from the ground mounted solar arrays across the field
A cable trench with ducting laid in it, dug across the grass between two long poultry sheds
An installer fitting solar panels to the top row of a ground mounted frame, a poultry shed behind
Galvanised ground mount frames standing bare in a grass field beside the farm track, before the panels went on
A new distribution board on a bare blockwork wall, before the inverters and batteries were fitted below
Two SolaX inverters with red isolators on galvanised trunking above six Triple Power batteries, a distribution board alongside