Skip to content
Coastal Electrical Services (CES) Lincs Ltd
Case study

Full Rewire and Fire Detection, Linkage Training Centre

Published 13 February 2026

Project Overview

We were appointed to deliver a complete electrical and life-safety installation for a specialist training centre operated by Linkage. The project involved transforming the building into a modern, safe, and fully compliant learning environment, designed to support both staff and trainees with reliable infrastructure, future capacity, and energy efficiency at its core.

This was a full package project, covering design, installation, testing, certification, and as-installed documentation.

Scope of Works

Full Electrical Rewire

  • Complete removal of outdated wiring systems
  • Installation of new distribution circuits throughout
  • Modernised infrastructure designed for present and future load demands

Addressable Fire Alarm System

  • Full design and installation of an addressable fire detection and alarm system
  • Zoning tailored to building layout and occupancy type
  • Detection, sounders, call points, and control equipment installed to current standards
  • Fire alarm plans, design documentation, and system specifications provided

Intruder Alarm Installation

  • Full building security coverage
  • Detection devices positioned for maximum protection
  • Control system installed to support staff safety and asset protection

Data Installation

  • Structured cabling system throughout the facility
  • Data points installed to training rooms, offices, and operational areas
  • Network infrastructure supporting modern digital learning and administration

Solar PV & Battery Storage

  • Solar photovoltaic system installed to reduce grid dependency
  • Battery storage system enabling energy optimisation and load management
  • Designed to lower operational costs and improve sustainability credentials

Containment & Distribution

  • Dado trunking system installed throughout teaching and work areas
  • Provides safe, accessible containment for power and data
  • Allows future flexibility and easy expansion
  • Fuse board (distribution board) upgrade to support new installation loads

Lighting Systems

  • Full internal lighting installation using energy-efficient fittings
  • Emergency lighting system installed to ensure safe evacuation
  • External lighting added for site safety and security
  • External emergency lighting to support safe exit routes

Testing & Certification

  • Full electrical testing of all circuits and systems
  • Certification provided in accordance with current regulations
  • Verification of life-safety systems for compliance and performance

Design & Documentation Package

As part of our turnkey service, we delivered:

  • Electrical schematics and circuit documentation
  • Fire alarm design drawings and plans
  • System specifications
  • As-installed information for ongoing maintenance and compliance
  • Ongoing real-time performance monitoring

Outcome

The completed installation has delivered:

  • A fully compliant and modern electrical system
  • Safe learning and working environments for staff and trainees
  • Integrated life-safety and security systems
  • Future-ready data and power infrastructure
  • Reduced energy costs through solar and battery technology
  • Clear documentation to support long-term maintenance

Looking Ahead

The Linkage Training Centre now benefits from a robust, efficient, and scalable electrical installation designed to support its educational operations for years to come.

From site

Photographs from the job.

An LED bulkhead light on the brick pier of the single storey training centre, beside its open glazed doors
A glazed brick corridor lit by round LED ceiling lights, with a red fire alarm sounder on the ceiling
A room with linear LED lights, a ceiling detector and sounder, and white dado trunking carrying sockets round the walls
A glazed garden room with linear LED ceiling lights, a fire alarm sounder and an exit sign over the doors
A cupboard with a wall hung boiler, hot water cylinder and copper pipework, beside a heating programmer and switched spurs
A kitchen with LED ceiling lights, a fire alarm sounder and sockets along the worktop, beside an open plant cupboard
A corridor with round LED ceiling lights, a fire alarm sounder, an exit sign and fire extinguishers by the wall
A black bollard light at the edge of a block paved path leading through the planting to the gate
A WC with a round LED ceiling light, an extractor fan, a red fire alarm sounder and a hand dryer
An accessible toilet with a ceiling track hoist, grab rails, round LED lights and a red emergency pull cord
An exit sign above an external door, a red fire alarm call point beside it and dado trunking with sockets
A data cabinet, distribution board, SolaX inverter and Triple Power battery fitted together in a small plant room
An empty room with linear LED lights, ceiling vents, a fire alarm detector and sounder, and dado trunking with sockets
A large room with linear LED lights, an exit sign and dado trunking with sockets, decorating still under way
All black solar panels on the hipped tiled roof of the single storey training centre, seen across the garden