Skip to content
Coastal Electrical Services (CES) Lincs Ltd
An electric vehicle charge point installed on a driveway wall
Lincolnshire · about an hour

Electricians and solar installers in Sleaford

Sleaford has grown a lot, and newer estates come with newer wiring and a different set of jobs. Mostly it is EV charge points, garden offices and the extra circuits people want once they have lived in a house a few years.

What matters in Sleaford

Commercial units and newer housing estates.

What we do most of here

EV charger installation on Sleaford estates

The newer estates here are good ground for a home charge point. Boards are modern, there is usually a spare way, and the run from the consumer unit to the driveway is short. The part worth checking first is the main fuse and the rest of the load, because a heat pump, an electric shower and a seven kilowatt charger on one supply need a proper load calculation and not an optimistic guess.

Every new charge point has to be smart under the regulations that came into force in 2022, which is no bad thing when an off peak tariff makes an overnight charge far cheaper than a daytime one. Rolec is what we fit most often around here. Tethered or untethered is genuinely your call, and it comes down to how tidy you want the wall to look against never having to remember where the cable is.

Garden office supplies wired to last

Garden rooms are one of the most common jobs on the estates around Sleaford, Ruskington and Heckington, and they are also among the ones most often done badly. An extension lead through a window is not a supply. The right answer is armoured cable on its own way in the board, buried at a sensible depth on a route we record, with a small board in the office so it can be isolated from inside.

Size it for winter and not for a laptop. Heating is what actually loads the cable, and a two kilowatt heater running all morning is the design case. While the trench is open, put a duct or a data cable in alongside it. Doing that later means lifting the same lawn twice, which nobody enjoys.

Extra circuits a few years into a new house

A house built to the developer minimum has just enough sockets, and after a few years in it people know exactly where they wanted more. Outside sockets, a garage supply, lighting in a converted loft, a hot tub circuit, a small board for the workshop. None of it is dramatic work, but a new circuit is notifiable under Part P, and all of it wants testing and certifying properly instead of being spurred off the nearest ring.

There is no legal requirement to have your own home inspected on a schedule, whatever its age. What is worth doing is a periodic inspection before adding much load, particularly a hot tub or a workshop, since those are the additions most likely to find the limit of what the original installation was designed around.

Panels and a battery on a newer Sleaford roof

Newer roofs are easy to work with. Simple rectangles, sound tiles and no tired lead flashings make for a straightforward install. The catch is size and orientation together, because an estate is laid out to a plan, so whole rows of houses face the same way and a good many of them face the wrong one. Expect a modest array on the pitch you have, not the figure quoted for a big detached house with a wide south facing roof.

That is where a battery earns its place, since a smaller array with storage behind it captures more of what little you make and carries it into the evening. All black modules are worth asking about on a newer estate too, where a mismatched panel colour stands out badly against a uniform roofline and there is nothing else on the street to hide behind.

Call usFree quote