Skip to content
Coastal Electrical Services (CES) Lincs Ltd
Case study

315kW Commercial Solar PV Installation, Distribution Centre Project

Completed 10 October 2025

Project Overview

CES Renewables recently completed a major 315kW rooftop solar PV installation for one of W7 Make UK’s distribution centres, delivering a high-performance system designed to cut energy costs, support sustainability goals, and maximise on-site generation.

This commercial installation features 758 × 415W JA Solar panels mounted on a mini-rail trapezoidal system, paired with twelve SolaX 25kW three-phase inverters for efficient and stable power delivery.

System Specification

  • 758 × 415W JA Solar panels
  • 12 × 25kW SolaX three-phase inverters
  • CT meters installed for precise grid monitoring
  • Full offsite monitoring and performance tracking

Delivery & Compliance

All works were delivered to the highest standards:

  • MCS certified installation
  • NICEIC certified electrical works
  • National Grid (DNO) application approved
  • Full testing, commissioning, and handover

Project Benefits

  • Reduced daytime electricity costs
  • Lower carbon emissions
  • Future-proof protection against rising energy prices
  • Consistent high generation aligned with operational demand• Long-term ROI and low maintenance
From site

Photographs from the job.

315kW Commercial Solar PV Installation, Distribution Centre Project, photograph 1
315kW Commercial Solar PV Installation, Distribution Centre Project, photograph 2
315kW Commercial Solar PV Installation, Distribution Centre Project, photograph 3
315kW Commercial Solar PV Installation, Distribution Centre Project, photograph 4
Call usFree quote